PRR Freight Schedules 1959-12-31: B-2

B-2
Enola to Potomac Yard

DAILY

Enola Lv. 5.15 PM
Creswell Ps. 6.45 PM
Washington Ar. 11.00 PM
Potomac Yard Ar. 12.01 AM

ENOLA -
Protect connection from Trains: S-81, PG-6, CE-2, CNY-2, and CG-2 of same day.

Consist - As per makeup.

Makeup - Block Classification
  1. All freight for Washington, D. C.
  2. Fillout - When necessary, to consist of cars for Potomac Yard and beyond and handled on rear of train.

WASHINGTON -
Perishables to be placed 3.00 AM prevailing time.
Universal Carloading Co. traffic to be placed by 4.00 AM prevailing time, Tuesday to Saturday, inclusive, and 11.59 PM prevailing time on Sundays.

REVISION AS OF NOVEMBER 5, 1960
RE-ISSUE AS OF JUNE 1, 1960
M.F.T.


Editor Note:
Under Enola, "Fillout" line in this schedule is formatted in a nonstandard way (relative to the rest of the schedules). I have placed it into the Makeup, rather than being a separate paragraph at the same indentation level as Consist as in the original. Also, original indented "Makeup" further, another nonstandard practice.


Typed by: Mark D. Bej, 1998-11-11
Proofread by ?, 0000-00-00
Web site owner: Mark D. Bej bejm@eeg.ccf.org
+1 216-444-0119