PRR Freight Schedules 1959.12.31: WC-5

"WEST COAST CLIPPER"

WC-5
Conway, Pa. to Chicago (55th St.), Ill.

DAILY

Conway Lv. 3.30 AM
Wood Ps. 4.00 AM
Crestline Ar. 9.30 AM
Crestline Lv. 10.30 AM
Fort Wayne (Adams) Ar. 1.30 PM (EST)
Fort Wayne (Jct.) Lv. 2.30 PM (CST)
Bart Ps. 5.30 PM
Chicago (55th St.) Ar. 6.30 PM

CONWAY -
Protect connection from Trains: ED-24 and CP-4 second previous day; ED-28, BC-9, PC-1, EP-2, SC-11, HW-3, PY-4, TH-3, WP-15, EC-9, ED-45, WC-15, EC-7, PC-7, BC-7, SWC-1, GWC-1, NWC-1, ED-59, CBF-2, BC-5, ED-3, SC-7, ED-43, AS-11, CBF-4 and PG-5 of previous day.

Consist -
As per makeup except merchandise and forwarder traffic subject to movement in WC-1 to Crestline for connection with LCL-1.

Makeup - Block Classification
  1. Cars for CRIP, Chicago.
  2. Cars of Colehour Classification; Cars of Chicago 55th St. Classification, exclusive of Blocks 1, 3 and 4; tank car shipments for Chicago routed via Colehour-NYC RR; traffic from New Brunswick, N.J. for Chicago-BRC delivery arriving in train SWC-1; traffic for Gary, Ind. and so routing and traffic routed via Chicago-IC RR (See Note 1).
  3. Cars for CMSTP&P (Milwaukee Road), Chicago.
  4. Cars for C&NW, Proviso.
  5. Perishables for Chicago Team Track.

CRESTLINE -
Pick up Auto Parts cars for So. Chicago-BRC delivery from CD-1 of same day.

Makeup - Block Classification
  1. Auto Parts for So. Chicago-BRC.
  2. Cars for CRIP, Chicago.
  3. Colehour Classification; cars of Chicago 55th St. Classification, exclusive of Blocks 1, 2, 4 and 5; tank car shipments for Chicago routed via Colehour-NYC RR; traffic from New Brunswick, N.J. for Chicago-BRC delivery; traffic for Gary, Ind. and so routing and traffic routed via Chicago-IC RR.
  4. CMSTP&P (Milwaukee Road) Chicago.
  5. C&NW-Proviso.
  6. Perishables for Chicago Team Track.

COLEHOUR -
Set off Blocks 1, 2 and 3.
Block 1 cars -
Lv. Colehour - 7.00 AM
Ar. So. Chicago-BRC - 7.30 AM following day.
Block 2 cars -
Lv. Colehour - 8.30 PM for delivery to CRIP-So. Chicago 9.00 PM same day.
Block 3 (55th St. cars) -
Lv. Colehour - 10.30 PM day of arrival
Ar. Chicago (55th St.) - 1.00 AM
Tank car shipments routed Colehour-NYC RR to be delivered NYC RR by 2.00 PM next day.
Shipments destined Chicago-BRC delivery -
Lv. Colehour - 7.00 AM
Ar. Clearing-BRC - 9.30 AM
Traffic for IC RR routed via Chicago -
Lv. Colehour - 10.00 AM
Ar. Grand Crossing - 11.00 AM following day and delivered IC RR on arrival.

CHICAGO (55th St.) -
Deliveries to be made to connecting lines as follows:
Milwaukee Road - Chicago 55th St. - Lv. 5.30 AM following day
Chicago Western Ave. - Ar. 6.30 AM same day.
C&NW - Chicago 55th St. - Lv. 11.30 PM same day.
- Proviso - Ar. 1.30 AM following day.

Perishables for Polk St. Team Track, cars must be placed for opening market 5.15 AM, prevailing time.

[NOTE] 1. -
In the event WC-5 has full tonnage of CMStP&P, C&NW and perishable for Chicago Team Track, the Colehour block may be dispatched on front end of train WC-7.

NOTE: 2. -
When advance section of combined WC-5/WC-7 is operated, train will operate on the following schedule:

OPERATE AS REQUIRED

Advance WC-5/WC-7 (Temporary)

Conway Lv. 3.30 PM
Crestline Ar. 9.45 PM
Crestline Lv. 10.45 PM
Fort Wayne (Adams) Ar. 3.30 AM (EST)
Fort Wayne (Jct.) Lv. 3.30 AM (CST)
Bart Ps. 6.00 AM
Chicago (59th St.) Ar. 7.00 AM

Consist - As per makeup.

Makeup - Block Classification
  1. CMStP&P
  2. C&NW
  3. CB&Q
  4. AT&SF

REVISION AS OF NOVEMBER 2, 1960
M.F.T.


Typed by: Mark D. Bej, 1998.02.11
Proofread by ?, 0000.00.00
Web site owner: Mark D. Bej bejm@eeg.ccf.org
+1 216-444-0119