PRR Freight Schedules 1959-12-31: ED-8

ED-8
Crestline, Ohio to Canton, Ohio

DAILY - EXCEPT SUNDAY

Crestline Lv. 4.00 PM
Mansfield Lv. 5.00 PM
Orrville Lv. 8.30 PM
Massillon Lv. 10.00 PM
Canton Ar. 10.30 PM

CRESTLINE -
Protect connection from Trains: GRE-2, FW-2 and CBC-1 of previous day; also FW-26, WC-2, CD-2 and FW-8 of same day.

Consist - All cars as per makeup.

Makeup - Block Classification
  1. Mansfield[,] including Lakeville and Big Prairie.
  2. Orrville.
  3. Massillon.
  4. Canton and beyond to Beaver Falls, exclusive; also to include River Branch points - Port Homer, O. to Toronto, O., both inclusive.

MANSFIELD -
Set off Block 1.
Pick up Blocks 2, 3 and 4.
Protect connection to ED-6 of following day.

ORRVILLE -
Set off Block 2.
Pick up as per makeup, including Conway and beyond.
Protect connection to Trains: FC-1 and AD-5 of following day.
Protect connection from trains FC-1 same day.

MASSILLON -
Set off Block 3.
Pick up as per makeup, including Conway and beyond.

CANTON -
Protect connection to Trains: TM-2, ED-38, CP-22, ST-2 and ED-26 of following day.

REVISION AS OF APRIL 27, 1959
Correction as of October 1, 1959
M.F.T.


Typed by: Mark D. Bej, 1998-10-21
Proofread by ?, 0000-00-00
Web site owner: Mark D. Bej bejm@eeg.ccf.org
+1 216-444-0119