PRR Freight Schedules 1959-12-31: ED-7

ED-7
Canton, Ohio to Crestline, Ohio

DAILY - Except Saturday.

Canton Lv. 7.00 PM
Massillon Lv. 7.30 PM
Orrville Lv. 8.15 PM
Mansfield Ar. 12.15 AM
Mansfield Lv. 1.15 AM
Crestline Ar. 1.30 AM

CANTON -
Protect connection from Trains: ED-37 and ED-25 of previous day; CP-23, TM-1 and PD-1 of same day.

Consist - All cars for points shown in makeup.

Makeup - Block Classification
  1. Massillon.
  2. Orrville, inclusive to Wooster, inclusive.
  3. Mansfield (Shreve to Mansfield, inclusive).
  4. Crestline, incl. to Lima, excl., to Tiro, incl.; to Sandusky, incl.; to Millersville, excl; to Columbus and so routing.

MASSILLON -
Set off Block 1 and pick up Block 4.

ORRVILLE -
Set off Orrville cars and protect connection from Trains: FC-1, AD-6 of same day.
Protect connection to Trains: FC-1, AD-5, of following day.

MANSFIELD -
Set off Block 3.
Pick up Block 4 cars, also Westbound cars for Crestline and beyond and Columbus and so routing from Train ED-5 of previous day.

Makeup - Indiscriminate.

CRESTLINE -
Protect connection to Trains: FW-1, CBC-2, WC-1 and PD-1 of same day.

REVISION AS OF NOVEMBER 24, 1959
M.F.T.


Typed by: Mark D. Bej, 1998-10-26
Proofread by ?, 0000-00-00
Web site owner: Mark D. Bej bejm@eeg.ccf.org
+1 216-444-0119