PRR Freight Schedules 1959-12-31: DC-9

DC-9
Detroit to Cincinnati

DAILY

Detroit (Flat Rock) -
    (Via DT&I)
Lv. 10.00 AM (ET)
Lima Ps. 2.00 PM
St. Paris Ps. 3.15 PM
Springfield Ar. 4.00 PM
Springfield (Via PRR) Lv. 4.15 PM
South Charleston Ar. 4.35 PM
South Charleston Lv. 4.40 PM
Xenia Ps. 5.10 PM
Cincinnati (Undercliff) Ar. 7.40 PM (ET)

DETROIT -
Consist: All cars as per makeup.

Makeup - Block Classification
  1. Loaded traffic routing via Cincinnati and L&N R.R. (This block to include empty tanks, covered hoppers and empty assigned equipment).
  2. Loaded traffic routing via Cincinnati and Southern Ry. (This vloak to include empty tanks, covered hoppers and empty assigned equipment).
  3. All traffic Cincinnati and beyond, except as provided for in Blocks 1 and 2.

CINCINNATI -
Contemplates delivery to L&N by 9.00 PM, for their train #75 Lv. 11.00 PM. Also to Southern Ry. (Gest St.) - 4.00 AM for their #51 due to leave 6.00 AM CT.

REVISION AS OF JANUARY 8, 1959
M.F.T.


Typed by: Mark D. Bej, 1998-11-02
Proofread by ?, 0000-00-00
Web site owner: Mark D. Bej bejm@eeg.ccf.org
+1 216-444-0119