PRR Freight Schedules 1959-12-31: CO-8

"THE INVINCIBLE"

CO-8
Logansport to Cincinnati

DAILY

Logansport (Anoka) Lv. 10.30 PM (CST)
Marion Lv. 11.59 PM
Ridgeville Ps. 1.00 AM
Richmond Ar. 2.55 AM (CST)
Richmond Lv. 5.30 AM (EST)
Hamilton Ar. 7.20 AM
Vaughn Ar. 8.00 AM
McCullough Ar. 9.05 AM
Cincinnati Ar. 9.30 AM

LOGANSPORT -
Protect connection from Trains: LD-14, LD-2, FW-89, CG-2, CNY-2, LD-6, NW-82 and LD-20 of same day.

Consist - As per makeup.

Makeup - Block Classification
  1. Cincinnati merchandise.
  2. Vaughn District.
  3. McCullough District.
  4. Cincinnati and beyond, including points Xenia, incl., to Clare, inclusive; and points on Zanesville Branch, Morrow, inclusive, to Circleville, inclusive; also cars for Middletown.
  5. Dayton - Xenia perishables only.

MARION -
Hold onto Blocks 1, 2 and 3. Pick up as per makeup.

Makeup - Block Classification
  1. Cincinnati merchandise (from Logansport).
  2. Vaughn District (from Logansport).
  3. McCullough District (from Logansport).
  4. Hamilton - B&O Delivery (from Marion).
  5. McCullough District (from Marion).
  6. Richmond and so routing (from Marion).
  7. Cincinnati and so routing, including points Xenia, inclusive, to Clare, inclusive; and points on Zanesville Branch, Morrow, inclusive, to Circleville, inclusive; also cars for Middletown (from Marion and Logansport).
  8. Dayton - Xenia perishables only.

RICHMOND -
Set off Blocks 6 and 8.
Protect connection to Trains: CN-28 (to be held for perishable ONLY), RH-6, CO-2, SW-2, APS-1, GR-7, CN-30 and CC-2 of same day; CL-10 of following day.
Pick up as per makeup.
Protect connection from Trains: CO-2, CL-11, CN-29, GR-6 (traffic for Hamilton Dist.), RH-2, CN-27, CC-2 and SW-8 of previous day.

Consist - All freight as per makeup.

Makeup - Block Classification
  1. Merchandise for Cincinnati.
  2. Vaughn District.
  3. McCullough District.
  4. Hamilton - B&O delivery.
  5. McCullough District.
  6. Cincinnati and beyond.

HAMILTON -
Set off Block 4. Cars to be delivered to B&O by noon same day.

VAUGHN -
Set off Block 2.

McCULLOUGH -
Set off Blocks 3 and 5.

CINCINNATI -
Contemplate deliveries to connecting lines as follows:
Perishables to Southern Rwy. by 2.00 PM same day.
Perishables to Plum Street - PRR-L&N facility to be available for trading at opening, morning after arrival.

Other traffic to Southern Rwy. by 2.00 PM same day for Train 1st 53 - Lv. 4.30 PM CT and 2nd 53 - Lv. 5.30 PM CT.

Other traffic to L&N RR by 4.00 PM same day for Train #75 Lv. 11.00 PM ET.

Protect connection to Train CN-38 of same day.

REVISION AS OF JUNE 1, 1960
M.F.T.


Typed by: Mark D. Bej, 1998-11-04
Proofread by ?, 0000-00-00
Web site owner: Mark D. Bej bejm@eeg.ccf.org
+1 216-444-0119